AxisOps Harbour
Labs

Topics

standards

A control list is a system requirement

Since October 2022 the specification of an accelerator you are permitted to buy has been written partly in Washington, in units of processing power and interconnect bandwidth. Export control used to be a legal department's problem. It is now a line in the architecture, and it is the first time in this notebook's span that a chip's spec sheet has been set by policy.